Construction
We conduct all of our own groundwork, from site-surveying, site clearance and excavations through to drainage, running services and laying the concrete slab.
The frames are erected one floor at a time, with ceiling joists, counter-battens and floor decking being fixed before the next set of frames is erected.
Either truss or cut roofs are used, as appropriate with roof cladding systems depending on the design. If possible, we prefer to use natural slate roofing and galvanised steel guttering which have better longevity and appearance, and avoids using plastic. The next stage is for windows and doors to be fitted to specification, thus making the building weatherproof.
To increase the volume available for insulation, external frames, roofs and ceilings are counter-battened. At this stage, First Fix can be conducted, allowing sub-contracted plumbers and electricians to fit everything before plastering. In parallel, the exterior brick, block, stone or timber cladding can be fitted.
Next, we insulate the whole building with up to 250mm of WarmCel®, and seal the walls with a moisture barrier and plasterboard. Second fix follows plastering, and the house is complete.